This project concerns the new multi-storey building at the Sammontana S.p.A. production plant in Empoli.The intervention consists of the construction of a new building, divided into two blocks that are independent from a plant engineering perspective:
Block “A” – Multi-Storey BuildingA multi-storey building, with 4 above-ground floors mainly designated for changing rooms, offices, laboratories, and recreational rooms.
Block “D” – Cellists’ BuildingA 2-storey building above ground, designed to house the service rooms for the cellists.
The main planned MEP works can be summarized as follows:
Technical rooms
Air handling system
Hydronic heating and cooling system with fan coils
Water supply and sanitary system
Black and grey water drainage system
Compressed air and vacuum system